Difference between revisions of "EUROKITE PROJECT DATASHARING"

From Anitra Support
Jump to: navigation, search
Line 18: Line 18:
 
'''3) Data controllers'''<br>
 
'''3) Data controllers'''<br>
  
: Each project partner designates one person as a „data controller“ (DC) and the DC then manages data access for other people.  
+
: Each project partner designates one person as a „data controller“ (DC) and the DC then manages data access for other people. <br>
 
: E.g Fabienne being DC for the LPO workgroup can propose the list of French names using „+ Add person“ button assigning them the „Subproject/workgroup access“ role.
 
: E.g Fabienne being DC for the LPO workgroup can propose the list of French names using „+ Add person“ button assigning them the „Subproject/workgroup access“ role.

Revision as of 15:19, 3 September 2022


1) Overview to „Groups and Projects“ and to Eurokite data categorisation terminology

Eurokite Data Use Agreements (DUA) signed between project partners are implemented using Anitra Groups/Project functionality.
According to DUAs, the Tracking (Telemetry) data are classified in to A, B, and C categories.
A = project data made available top-down from MEGEG to Partners filtered by the geography access specified in DUA.
B = data where certain partner directly participated e.g. during the tagging are available for the involved partner in an unfiltered way
C = data made available bottom-up i.e. from Associated Beneficiary to the project. If not specified otherwise the data are visible to other project partners again based on the geography access
Overview of the Eurokite tracking data structure by ABC categories is available in „Project“ functionality („Tracking/Animals“ tab)

2) Workgroups/subprojects

For every project partner, a dedicated Eurokite workgroup/subproject is created to host partner-specific configurations such as persons involved, access and responsibility areas, trackings/animals shared to project, and similar (overview of all the groups can be seen in Eurokite project „Workgroups“ tab).
Click through in order to review and check the configuration and data of your workgroup

3) Data controllers

Each project partner designates one person as a „data controller“ (DC) and the DC then manages data access for other people.
E.g Fabienne being DC for the LPO workgroup can propose the list of French names using „+ Add person“ button assigning them the „Subproject/workgroup access“ role.